Spanner CHP system using Pezzolato wood chip drier hits 8279 hours in first year of operation

TW Power News : Spanner CHP system using Pezzolato wood chip drier hits 8279 hours in first year of operation

The importance of a well managed wood chip fuel stock for the Spanner CHP system has always been very important. Pezzolato have now shown that with the correct equipment to provide consistent wood chip, the Spanner CHP system runs with almost no downtime.

TW Power are now supplier of the Pezzolato system and can incorporate it into the installation of the Spanner systems. Consistent high quality fuel input means consistent output.

Pezzolato PG 50 cogeneration plant reaches 8279 hours of operation in the first year of life.

The proper designers's design, the precise Pezzolato technicians' installation and commissioning combined with an excellent customer's management and maintenance enabled "turnkey" PG50 cogeneration plant, activated the 04/24/2015, to reach the 8279 hours of operation at 99% of the nominal electric power with a total of 369 243 electric kWh products and placed on the network.

The cogeneration plant's computer screen that shows the details of the hours of operation.

The complete cogeneration system consists of a PEZZOLATO PTH DRUM WOOD CHIPPER, a PEZZOLATO DRYING AND SCREENING WOOD CHIPS SYSTEM AND A SPANNER RE2 GASIFICATION PLANT.